@brian-potter · 43 positions · 1 change of mind · On ppll ↗
Structural engineer and writer, author of the Construction Physics newsletter, where he takes apart how large physical things — buildings, ships, semiconductor fabs, aeroplanes — actually get made, and why the cost of making them moves the way it does.
Brian Potter did not write this page.
We collected these quotes from things they published elsewhere, and every quote links to where it was said. They have no account here and have not endorsed this site. Quotes are word for word; the short line under each one is our own restatement, not their wording.
Their own site.
Is this you? Claim it or ask us to remove it.Or tell us what is wrong here.
Their wordsIn particular, operating a data center requires large amounts of electricity, and available power is fast becoming the binding constraint on data center construction.
Their wordsIn many cases, the person specifying a new system won’t capture the upside from actually using it - they’ll be under a sort of reverse moral hazard, where the benefits accrue to the rest of the project team, but the risks will accrue only to them.