korrents

What Austin Vernon thinks about design

@austin-vernon · 42 positions · 0 changes of mind

Engineer and investor who writes quantitative posts about how physical industries actually work — chemical plants, geothermal drilling, shipyards, thermal storage and the economics of low-volume manufacturing — at austinvernon.site.

Austin Vernon did not write this page.

We collected these quotes from things they published elsewhere, and every quote links to where it was said. They have no account here and have not endorsed this site. Quotes are word for word; the short line under each one is our own restatement, not their wording. Their own site. Is this you? Claim it or ask us to remove it. Or tell us what is wrong here.

12 dated positions, 2021 to 2026, in their own words. Our reading of what Austin Vernon has said — not written or endorsed by them.

12 positions so far — this page is not yet offered to search engines.

  1. Reviving manufacturing doesn't require a planned economy, just a better business model.

    Speed Can Reindustrialize Americaaustinvernon.site 1st of 15 in this piece

    America

  2. Zero tariffs are the best way to help them.

    Speed Can Reindustrialize Americaaustinvernon.site 10th of 15 in this piece

    tariffs

  3. 11 months earlier
  4. Making ultra cheap products requires different rules and strategy.

    Startup Strategy for Commodity Productsaustinvernon.site

    startups

  5. 4 months earlier
  6. by

    Cheap, lightweight people movers are currently illegal in many situations, so regulation is a barrier.

    Human Driving Increases Transportation Cost 10xaustinvernon.site 3rd of 3 in this piece

  7. 7 months earlier
  8. The solar array sizes under these assumptions are prohibitively large.

    How to Make Off Grid Data Centers Affordableaustinvernon.site 1st of 9 in this piece

    solardata centersbatteries

  9. The cooling systems in most data centers are energy hogs and contribute no direct value.

    How to Make Off Grid Data Centers Affordableaustinvernon.site 3rd of 9 in this piece

    data centersenergy

  10. AI servers bring new challenges because many require liquid cooling.

    How to Make Off Grid Data Centers Affordableaustinvernon.site 4th of 9 in this piece

  11. Deleting the UPSs could knock off ~$750/kW after considering equipment, installation, and square footage reduction.

    How to Make Off Grid Data Centers Affordableaustinvernon.site 5th of 9 in this piece

    data centersbatteries

  12. The 100-megawatt facility might have ten 10-megawatt blocks served directly by a 1500V DC feeder line without connections to other blocks that would require extra switches and routing.

    How to Make Off Grid Data Centers Affordableaustinvernon.site 6th of 9 in this piece

    data centers

  13. Efforts to improve efficiency and remove vestigial features pay off handsomely.

    How to Make Off Grid Data Centers Affordableaustinvernon.site 8th of 9 in this piece

    data centerselectric vehicles

  14. 3 months earlier
  15. Specialized suppliers need multiple shipyards in one location to steady their business.

    Revitalizing US Navy Shipbuildingaustinvernon.site 4th of 4 in this piece

  16. 2 years earlier
  17. by

    E-bikes range in price from $1000 to $10,000. The market is still lacking a Toyota Corolla equivalent.

    The Future of E-Bikesaustinvernon.site 1st of 2 in this piece