What Austin Vernon thinks about data centers

@austin-vernon · 42 positions · On ppll ↗

Engineer and investor who writes quantitative posts about how physical industries actually work — chemical plants, geothermal drilling, shipyards, thermal storage and the economics of low-volume manufacturing — at austinvernon.site.

Austin Vernon did not write this page.

We collected these quotes from things they published elsewhere, and every quote links to where it was said. They have no account here and have not endorsed this site. Quotes are word for word; the short line under each one is our own restatement, not their wording. Their own site. Is this you? Claim it or ask us to remove it. Or tell us what is wrong here.

9 dated positions, 2024, in their own words. Our reading of what Austin Vernon has said — not written or endorsed by them.

  1. solardesignbatteries

    The solar array sizes under these assumptions are prohibitively large.

    ↗How to Make Off Grid Data Centers Affordableaustinvernon.site 1st of 9 in this piece

  2. solarenergy

    The optimal scenario is typically when the generators supply 1% of yearly electricity (shown below).

    ↗How to Make Off Grid Data Centers Affordableaustinvernon.site 2nd of 9 in this piece

  3. energydesign

    The cooling systems in most data centers are energy hogs and contribute no direct value.

    ↗How to Make Off Grid Data Centers Affordableaustinvernon.site 3rd of 9 in this piece

  4. AI servers bring new challenges because many require liquid cooling.

    ↗How to Make Off Grid Data Centers Affordableaustinvernon.site 4th of 9 in this piece

  5. batteries

    Deleting the UPSs could knock off ~$750/kW after considering equipment, installation, and square footage reduction.

    ↗How to Make Off Grid Data Centers Affordableaustinvernon.site 5th of 9 in this piece

  6. The 100-megawatt facility might have ten 10-megawatt blocks served directly by a 1500V DC feeder line without connections to other blocks that would require extra switches and routing.

    ↗How to Make Off Grid Data Centers Affordableaustinvernon.site 6th of 9 in this piece

  7. Installed generators cost ~$800/kW, and the data center capital cost, including servers, is ~$40,000/kW, so adding 1% more makeup compute capacity is money ahead of purchasing generators.

    ↗How to Make Off Grid Data Centers Affordableaustinvernon.site 7th of 9 in this piece

  8. electric vehicles

    Efforts to improve efficiency and remove vestigial features pay off handsomely.

    ↗How to Make Off Grid Data Centers Affordableaustinvernon.site 8th of 9 in this piece

  9. Some efforts, like nuclear-powered data centers, are reminiscent of Toyota's hydrogen push.

    ↗How to Make Off Grid Data Centers Affordableaustinvernon.site 9th of 9 in this piece