Tap a claim on the ring to put it at the centre.
← The AI build-out is not yet a bubble, because it lacks the…
17 connected korrents · 13 moments on record from 18 Apr 2024 to 26 Aug 2026.
Everything filed under data centers
data centers
Everything filed under semiconductors
semiconductors
Everything filed under energy
energy
Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject
Read this korrent: The AI build-out is not yet a bubble, because it lacks the self-reinforcing feedback loop that drove the railway and telecom manias.
The AI build-out is not yet a bubble, because it lacks the self-reinforcing feedback loop that drove the railway and telecom manias.
Last stated 2 years ago
13 Jan 2025
DO
Doug O'Laughlin — holds since 2025-01-13 — tap for who they are
Same subject: If the AI build-out does become a bubble, power and data centres are the assets that will carry it. — tap to centre the map on it
If the AI build-out does become a bubble, power and data centres are the assets that will carry it.
Last stated 2 years ago
13 Jan 2025
DO
Doug O'Laughlin — holds since 2025-01-13 — tap for who they are
Same subject: There is no AI bubble on the demand side: the shortage of computing capacity is global, and spans every company and industry. — tap to centre the map on it
There is no AI bubble on the demand side: the shortage of computing capacity is global, and spans every company and industry.
Last stated 8 months ago
8 Jan 2026
JH
Jensen Huang — holds since 2026-01-08 — tap for who they are
Same subject: Semiconductor infrastructure has not kept up with AI's growth, and closing that gap needs capacity built in unconventional ways. — tap to centre the map on it
Semiconductor infrastructure has not kept up with AI's growth, and closing that gap needs capacity built in unconventional ways.
Last stated 3 months ago
18 Jun 2026
LT
Lip-Bu Tan — holds since 2026-06-18 — tap for who they are
Same subject: Broad deployment of AI that can learn on the job will very likely produce rapid economic growth for some period of time. — tap to centre the map on it
Broad deployment of AI that can learn on the job will very likely produce rapid economic growth for some period of time.
Last stated 9 months ago
25 Nov 2025
IS
Ilya Sutskever — holds since 2025-11-25 — tap for who they are
Same subject: The massive AI build-out is the right thing to be doing, and the only thing that will slow it is supply. — tap to centre the map on it
The massive AI build-out is the right thing to be doing, and the only thing that will slow it is supply.
Last stated 3 months ago
18 Jun 2026
LT
Lip-Bu Tan — holds since 2026-06-18 — tap for who they are
Same subject: AI will not centralise the economy into a handful of companies; there are going to be many thousands of winners. — tap to centre the map on it
AI will not centralise the economy into a handful of companies; there are going to be many thousands of winners.
Last stated a month ago
31 Jul 2026
PC
Patrick Collison — holds since 2026-07-31 — tap for who they are
Same subject: The absence of a visible productivity jump from AI proves nothing, because a real ten percent uplift across the board would be impressive and almost invisible from outside. — tap to centre the map on it
The absence of a visible productivity jump from AI proves nothing, because a real ten percent uplift across the board would be impressive and almost invisible from outside.
Last stated 2 weeks ago
26 Aug 2026
CM
Casey Muratori — holds since 2026-08-26 — tap for who they are
Same subject: It is still early in AI go-to-market: the markets have not hardened and the good tools do not exist yet. — tap to centre the map on it
It is still early in AI go-to-market: the markets have not hardened and the good tools do not exist yet.
Last stated 8 months ago
1 Jan 2026
JL
Jason Lemkin — holds since 2026-01-01 — tap for who they are
Same subject: A data centre earns its county far more tax revenue per gallon of water than a golf course does. — tap to centre the map on it
A data centre earns its county far more tax revenue per gallon of water than a golf course does.
Last stated 11 months ago
11 Oct 2025
AM
Andy Masley — holds since 2025-10-11 — tap for who they are
Same subject: A data centre powered by solar and batteries alone needs an array so oversized that the design is not worth building. — tap to centre the map on it
A data centre powered by solar and batteries alone needs an array so oversized that the design is not worth building.
Last stated 2 years ago
18 Apr 2024
AV
Austin Vernon — holds since 2024-04-18 — tap for who they are
Same subject: A data centre should be split into independent power blocks fed directly at 1500 volts DC, rather than run through one central distribution system. — tap to centre the map on it
A data centre should be split into independent power blocks fed directly at 1500 volts DC, rather than run through one central distribution system.
Last stated 2 years ago
18 Apr 2024
AV
Austin Vernon — holds since 2024-04-18 — tap for who they are
Same subject: A government taking a stake in its chipmaker is ordinary infrastructure policy — Taiwan, Japan and Singapore all did it. — tap to centre the map on it
A government taking a stake in its chipmaker is ordinary infrastructure policy — Taiwan, Japan and Singapore all did it.
Last stated 3 months ago
18 Jun 2026
LT
Lip-Bu Tan — holds since 2026-06-18 — tap for who they are
Same subject: A homebuilt accelerator forces you to be your own operator; Nvidia systems are designed for anyone to operate, which is why they are in every cloud. — tap to centre the map on it
A homebuilt accelerator forces you to be your own operator; Nvidia systems are designed for anyone to operate, which is why they are in every cloud.
Last stated 5 months ago
15 Apr 2026
JH
Jensen Huang — holds since 2026-04-15 — tap for who they are
Same subject: A semiconductor fab costs what it costs because it is a mass-production factory that has to hold atomic precision around the clock. — tap to centre the map on it
A semiconductor fab costs what it costs because it is a mass-production factory that has to hold atomic precision around the clock.
Last stated 2 years ago
3 May 2024
BP
Brian Potter — holds since 2024-05-03 — tap for who they are
Same subject: "Food from thin air" is not from thin air: it runs on water, minerals, ammonia and industrial plant. — tap to centre the map on it
"Food from thin air" is not from thin air: it runs on water, minerals, ammonia and industrial plant.
Last stated 2 months ago
30 Jun 2026
CS
Chris Smaje — holds since 2026-06-30 — tap for who they are
Same subject: A country outside the AI supply chain should just buy the index — which works only in the world where AI ends up commoditised rather than concentrated. — tap to centre the map on it
A country outside the AI supply chain should just buy the index — which works only in the world where AI ends up commoditised rather than concentrated.
Last stated 3 months ago
4 Jun 2026
AI
Alex Imas — holds since 2026-06-04 — tap for who they are
Same subject: A future of constrained energy will need more people working the land, and that is not the same as going back to the past. — tap to centre the map on it
A future of constrained energy will need more people working the land, and that is not the same as going back to the past.
Last stated 2 months ago
30 Jun 2026
CS
Chris Smaje — holds since 2026-06-30 — tap for who they are
same subject or similar wording a cloud: claims about one subject, named for it bar: when it was last stated, on a scale from 2015 to today — full is today a face: someone on record holding the claim — tap it for who they are
At the centre
The AI build-out is not yet a bubble, because it lacks the self-reinforcing feedback loop that drove the railway and telecom manias.
Last stated 13 Jan 2025 · 2 years ago
Holds DO Doug O'Laughlin
Read this korrent →
Similar wording
If the AI build-out does become a bubble, power and data centres are the assets that will carry it.
Last stated 13 Jan 2025 · 2 years ago
Holds DO Doug O'Laughlin
Similar wording
There is no AI bubble on the demand side: the shortage of computing capacity is global, and spans every company and industry.
Last stated 8 Jan 2026 · 8 months ago
Holds JH Jensen Huang
Similar wording
Semiconductor infrastructure has not kept up with AI's growth, and closing that gap needs capacity built in unconventional ways.
Last stated 18 Jun 2026 · 3 months ago
Holds LT Lip-Bu Tan
Similar wording
Broad deployment of AI that can learn on the job will very likely produce rapid economic growth for some period of time.
Last stated 25 Nov 2025 · 9 months ago
Holds IS Ilya Sutskever
Similar wording
The massive AI build-out is the right thing to be doing, and the only thing that will slow it is supply.
Last stated 18 Jun 2026 · 3 months ago
Holds LT Lip-Bu Tan
Similar wording
AI will not centralise the economy into a handful of companies; there are going to be many thousands of winners.
Last stated 31 Jul 2026 · a month ago
Holds Patrick Collison
Similar wording
The absence of a visible productivity jump from AI proves nothing, because a real ten percent uplift across the board would be impressive and almost invisible from outside.
Last stated 26 Aug 2026 · 2 weeks ago
Holds CM Casey Muratori
Similar wording
It is still early in AI go-to-market: the markets have not hardened and the good tools do not exist yet.
Last stated 1 Jan 2026 · 8 months ago
Holds JL Jason Lemkin
Same subject: data centers
A data centre earns its county far more tax revenue per gallon of water than a golf course does.
Last stated 11 Oct 2025 · 11 months ago
Holds AM Andy Masley
Same subject: data centers
A data centre powered by solar and batteries alone needs an array so oversized that the design is not worth building.
Last stated 18 Apr 2024 · 2 years ago
Holds AV Austin Vernon
Same subject: data centers
A data centre should be split into independent power blocks fed directly at 1500 volts DC, rather than run through one central distribution system.
Last stated 18 Apr 2024 · 2 years ago
Holds AV Austin Vernon
Same subject: semiconductors
A government taking a stake in its chipmaker is ordinary infrastructure policy — Taiwan, Japan and Singapore all did it.
Last stated 18 Jun 2026 · 3 months ago
Holds LT Lip-Bu Tan
Same subject: semiconductors
A homebuilt accelerator forces you to be your own operator; Nvidia systems are designed for anyone to operate, which is why they are in every cloud.
Last stated 15 Apr 2026 · 5 months ago
Holds JH Jensen Huang
Same subject: semiconductors
A semiconductor fab costs what it costs because it is a mass-production factory that has to hold atomic precision around the clock.
Last stated 3 May 2024 · 2 years ago
Holds BP Brian Potter
Same subject: energy
"Food from thin air" is not from thin air: it runs on water, minerals, ammonia and industrial plant.
Last stated 30 Jun 2026 · 2 months ago
Holds CS Chris Smaje
Same subject: energy
A country outside the AI supply chain should just buy the index — which works only in the world where AI ends up commoditised rather than concentrated.
Last stated 4 Jun 2026 · 3 months ago
Holds AI Alex Imas
Same subject: energy
A future of constrained energy will need more people working the land, and that is not the same as going back to the past.
Last stated 30 Jun 2026 · 2 months ago
Holds CS Chris Smaje