korrents

← Space data centres solve the wrong problem, because the contended…

On the map

8 connected korrents · 8 moments on record from 18 Apr 2024 to 10 Aug 2026.

Same subjectSame subjectSame subjectSame subjectSame subjectSame subjectSame subjectSame subject Space data centres solvethe wrong problem, becausethe contended resource is… DP Dylan Patel — holds since 2026-03-13 Available power, not land or capital, is what now limits how many data centres get built. Available power, notland or capital, is… BP Brian Potter — holds since 2024-06-10 Concerns about the energy cost of an individual LLM prompt are no longer credible, though the environmental impact of the AI datacenter buildout remains a real worry. Concerns about theenergy cost of an… HR Hannah Ritchie — holds since 2025-05-06 SW Simon Willison — holds since 2024-12-31 Cooling adds nothing to what a data centre produces, which is why it is the first thing a good design deletes rather than optimises. Cooling adds nothing towhat a data centre… AV Austin Vernon — holds since 2024-04-18 Data centre opposition only pushes construction to the parts of America that regulate energy and pollution least. Data centre oppositiononly pushes… TP Thomas Ptacek — holds since 2026-08-10 Data centres and the grid that feeds them run on incompatible clocks: one is a two-year project, the other a multi-decade investment. Data centres and thegrid that feeds them… BP Brian Potter — holds since 2024-06-10 Data centres had not raised the average American household's electricity bill as of 2025; inflation and the gas-price shock did. Data centres had notraised the average… AM Andy Masley — holds since 2025-10-10 Data centres should be built to degrade gracefully when the grid needs its power back, instead of demanding perfect uptime from utilities that have idle capacity most of the year. Data centres should bebuilt to degrade… JH Jensen Huang — holds since 2026-03-23 Data-centre electricity consumption will rise substantially even after allowing for every efficiency gain now in sight. Data-centre electricityconsumption will rise… BP Brian Potter — holds since 2024-06-10
same subject