← Natural gas can power the first gigawatt of data centres a year but…
8 connected korrents · 7 moments on record from 18 Apr 2024 to 13 Mar 2026.
Everything filed under data centers
data centers
Everything filed under batteries
batteries
Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject
Read this korrent: Natural gas can power the first gigawatt of data centres a year but not the fiftieth, because every input behind it runs into a supply limit.
Natural gas can power the first gigawatt of data centres a year but not the fiftieth, because every input behind it runs into a supply limit.
Last stated a year ago
15 Aug 2025
CH
Casey Handmer — holds since 2025-08-15 — tap for who they are
Same subject: A data centre earns its county far more tax revenue per gallon of water than a golf course does. — tap to centre the map on it
A data centre earns its county far more tax revenue per gallon of water than a golf course does.
Last stated 11 months ago
11 Oct 2025
AM
Andy Masley — holds since 2025-10-11 — tap for who they are
Same subject: A data centre powered by solar and batteries alone needs an array so oversized that the design is not worth building. — tap to centre the map on it
A data centre powered by solar and batteries alone needs an array so oversized that the design is not worth building.
Last stated 2 years ago
18 Apr 2024
AV
Austin Vernon — holds since 2024-04-18 — tap for who they are
Same subject: A data centre should be split into independent power blocks fed directly at 1500 volts DC, rather than run through one central distribution system. — tap to centre the map on it
A data centre should be split into independent power blocks fed directly at 1500 volts DC, rather than run through one…
Last stated 2 years ago
18 Apr 2024
AV
Austin Vernon — holds since 2024-04-18 — tap for who they are
Same subject: A solar-powered data centre can cut its power draw a great deal while giving up very little compute, which is how it survives a run of bad weather. — tap to centre the map on it
A solar-powered data centre can cut its power draw a great deal while giving up very little compute, which is how…
Last stated a year ago
15 Aug 2025
CH
Casey Handmer — holds since 2025-08-15 — tap for who they are
Same subject: About a fifth of the US grid could be freed for data centres just by covering the yearly peak with batteries or peaker plants. — tap to centre the map on it
About a fifth of the US grid could be freed for data centres just by covering the yearly peak with batteries or…
Last stated 6 months ago
13 Mar 2026
DP
Dylan Patel — holds since 2026-03-13 — tap for who they are
Same subject: After the cloud exit, the next step is out of the data centre: home servers and multi-gigabit home connections make the garage startup literal again. — tap to centre the map on it
After the cloud exit, the next step is out of the data centre: home servers and multi-gigabit home connections…
Last stated a year ago
12 Jul 2025
DH
David Heinemeier Hansson — holds since 2025-07-12 — tap for who they are
Same subject: American data centres consume about 66 million gallons of water a day, a small fraction of what they withdraw. — tap to centre the map on it
American data centres consume about 66 million gallons of water a day, a small fraction of what they withdraw.
Last stated a year ago
30 Aug 2025
BP
Brian Potter — holds since 2025-08-21 — tap for who they are
BP
Brian Potter — no longer holds since 2025-08-30 — tap for who they are
Same subject: An off-grid data centre can delete its uninterruptible power supplies entirely, because the battery bank outside already is one. — tap to centre the map on it
An off-grid data centre can delete its uninterruptible power supplies entirely, because the battery bank…
Last stated 2 years ago
18 Apr 2024
AV
Austin Vernon — holds since 2024-04-18 — tap for who they are
same subject or similar wording a cloud: claims about one subject, named for it bar: how recently it was last stated — full and dark this week, a faint sliver at five years