Tap a claim on the ring to put it at the centre.
← Gas power plant projects under development deserve public clarity rather than opacity.
17 connected korrents · 18 moments on record from 20 Dec 2018 to 18 Jun 2026.
Everything filed under data centers
data centers
Everything filed under energy
energy
Everything filed under batteries
batteries
Everything filed under China
China
Everything filed under infrastructure
infrastructure
Everything filed under solar
solar
Everything filed under investing
investing
Everything filed under AGI
AGI
Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject Same subject
Read this korrent: Gas power plant projects under development deserve public clarity rather than opacity.
Gas power plant projects under development deserve public clarity rather than opacity.
Last stated a year ago
16 Jun 2025
NB
Nat Bullard — holds since 2025-06-16 — tap for who they are
Same subject: The binding constraint on building anything in America is permitting and litigation, not money. — tap to centre the map on it
The binding constraint on building anything in America is permitting and litigation, not money.
Last stated a year ago
28 May 2025
CH
Casey Handmer — holds since 2023-11-10 — tap for who they are
JC
John H. Cochrane — holds since 2025-04-14 — tap for who they are
BP
Brian Potter — holds since 2025-05-28 — tap for who they are
Same subject: Semiconductor infrastructure has not kept up with AI's growth, and closing that gap needs capacity built in unconventional ways. — tap to centre the map on it
Semiconductor infrastructure has not kept up with AI's growth, and closing that gap needs capacity built in unconventional ways.
Last stated 3 months ago
18 Jun 2026
LT
Lip-Bu Tan — holds since 2026-06-18 — tap for who they are
Same subject: Nobody will finance new gas turbine factories, because paying one off takes twenty years of a market that solar and batteries will already have taken. — tap to centre the map on it
Nobody will finance new gas turbine factories, because paying one off takes twenty years of a market that solar and batteries will already have taken.
Last stated a year ago
15 Aug 2025
CH
Casey Handmer — holds since 2025-08-15 — tap for who they are
Same subject: The real cost of transport demonstration projects is that they confuse decision-makers about whether mass transit still needs building. — tap to centre the map on it
The real cost of transport demonstration projects is that they confuse decision-makers about whether mass transit still needs building.
Last stated 8 years ago
20 Dec 2018
JW
Jarrett Walker — holds since 2018-12-20 — tap for who they are
Same subject: China faces a genuine, sizable output gap right now, not just a lower structural growth ceiling. — tap to centre the map on it
China faces a genuine, sizable output gap right now, not just a lower structural growth ceiling.
Last stated a year ago
13 Aug 2025
AB
Andrew Batson — holds since 2025-08-13 — tap for who they are
Same subject: The AI build-out is not yet a bubble, because it lacks the self-reinforcing feedback loop that drove the railway and telecom manias. — tap to centre the map on it
The AI build-out is not yet a bubble, because it lacks the self-reinforcing feedback loop that drove the railway and telecom manias.
Last stated 2 years ago
13 Jan 2025
DO
Doug O'Laughlin — holds since 2025-01-13 — tap for who they are
Same subject: Scaling what we already have, with no further breakthroughs, will be enough to reach AGI. — tap to centre the map on it
Scaling what we already have, with no further breakthroughs, will be enough to reach AGI.
Last stated a year ago
23 Jul 2025
DH
Demis Hassabis — holds since 2025-07-23 — tap for who they are
Same subject: China will have a working EUV machine long before it can build them in quantity, because production hell takes years after the lab result. — tap to centre the map on it
China will have a working EUV machine long before it can build them in quantity, because production hell takes years after the lab result.
Last stated 6 months ago
13 Mar 2026
DP
Dylan Patel — holds since 2026-03-13 — tap for who they are
Same subject: About a fifth of the US grid could be freed for data centres just by covering the yearly peak with batteries or peaker plants. — tap to centre the map on it
About a fifth of the US grid could be freed for data centres just by covering the yearly peak with batteries or peaker plants.
Last stated 6 months ago
13 Mar 2026
DP
Dylan Patel — holds since 2026-03-13 — tap for who they are
Same subject: An off-grid data centre can delete its uninterruptible power supplies entirely, because the battery bank outside already is one. — tap to centre the map on it
An off-grid data centre can delete its uninterruptible power supplies entirely, because the battery bank outside already is one.
Last stated 2 years ago
18 Apr 2024
AV
Austin Vernon — holds since 2024-04-18 — tap for who they are
Same subject: Apple's risk is being reduced to hardware: people keep buying the best phone while everything they do on it comes from someone else's model. — tap to centre the map on it
Apple's risk is being reduced to hardware: people keep buying the best phone while everything they do on it comes from someone else's model.
Last stated a year ago
2 Sept 2025
BE
Benedict Evans — holds since 2025-09-02 — tap for who they are
Same subject: A country outside the AI supply chain should just buy the index — which works only in the world where AI ends up commoditised rather than concentrated. — tap to centre the map on it
A country outside the AI supply chain should just buy the index — which works only in the world where AI ends up commoditised rather than concentrated.
Last stated 4 months ago
4 Jun 2026
AI
Alex Imas — holds since 2026-06-04 — tap for who they are
Same subject: A handful of AI agents is not a handful of colleagues, because agents agree with you constantly and colleagues tell you where you are wrong. — tap to centre the map on it
A handful of AI agents is not a handful of colleagues, because agents agree with you constantly and colleagues tell you where you are wrong.
Last stated 6 months ago
22 Mar 2026
NF
Nicole Forsgren — holds since 2026-03-22 — tap for who they are
Same subject: A hybrid-electric airliner ends up heavier and more complex than the aircraft it replaces and delivers no fuel saving at all. — tap to centre the map on it
A hybrid-electric airliner ends up heavier and more complex than the aircraft it replaces and delivers no fuel saving at all.
Last stated 5 years ago
2 Apr 2021
BF
Bjorn Fehrm — holds since 2021-04-02 — tap for who they are
Same subject: A data centre earns its county far more tax revenue per gallon of water than a golf course does. — tap to centre the map on it
A data centre earns its county far more tax revenue per gallon of water than a golf course does.
Last stated 11 months ago
11 Oct 2025
AM
Andy Masley — holds since 2025-10-11 — tap for who they are
Same subject: A data centre should be split into independent power blocks fed directly at 1500 volts DC, rather than run through one central distribution system. — tap to centre the map on it
A data centre should be split into independent power blocks fed directly at 1500 volts DC, rather than run through one central distribution system.
Last stated 2 years ago
18 Apr 2024
AV
Austin Vernon — holds since 2024-04-18 — tap for who they are
Same subject: After the cloud exit, the next step is out of the data centre: home servers and multi-gigabit home connections make the garage startup literal again. — tap to centre the map on it
After the cloud exit, the next step is out of the data centre: home servers and multi-gigabit home connections make the garage startup literal again.
Last stated a year ago
12 Jul 2025
DH
David Heinemeier Hansson — holds since 2025-07-12 — tap for who they are
same subject or similar wording a cloud: claims about one subject, named for it bar: when it was last stated, on a scale from 2015 to today — full is today a face: someone on record holding the claim — tap it for who they are
At the centre
Gas power plant projects under development deserve public clarity rather than opacity.
Last stated 16 Jun 2025 · a year ago
Holds Nat Bullard
Read this korrent →
Similar wording
The binding constraint on building anything in America is permitting and litigation, not money.
Last stated 28 May 2025 · a year ago
Holds Casey Handmer John H. Cochrane Brian Potter
Similar wording
Semiconductor infrastructure has not kept up with AI's growth, and closing that gap needs capacity built in unconventional ways.
Last stated 18 Jun 2026 · 3 months ago
Holds Lip-Bu Tan
Similar wording
Nobody will finance new gas turbine factories, because paying one off takes twenty years of a market that solar and batteries will already have taken.
Last stated 15 Aug 2025 · a year ago
Holds Casey Handmer
Similar wording
The real cost of transport demonstration projects is that they confuse decision-makers about whether mass transit still needs building.
Last stated 20 Dec 2018 · 8 years ago
Holds Jarrett Walker
Similar wording
China faces a genuine, sizable output gap right now, not just a lower structural growth ceiling.
Last stated 13 Aug 2025 · a year ago
Holds Andrew Batson
Similar wording
The AI build-out is not yet a bubble, because it lacks the self-reinforcing feedback loop that drove the railway and telecom manias.
Last stated 13 Jan 2025 · 2 years ago
Holds Doug O'Laughlin
Similar wording
Scaling what we already have, with no further breakthroughs, will be enough to reach AGI.
Last stated 23 Jul 2025 · a year ago
Holds Demis Hassabis
Similar wording
China will have a working EUV machine long before it can build them in quantity, because production hell takes years after the lab result.
Last stated 13 Mar 2026 · 6 months ago
Holds Dylan Patel
Same subject: batteries
About a fifth of the US grid could be freed for data centres just by covering the yearly peak with batteries or peaker plants.
Last stated 13 Mar 2026 · 6 months ago
Holds Dylan Patel
Same subject: batteries
An off-grid data centre can delete its uninterruptible power supplies entirely, because the battery bank outside already is one.
Last stated 18 Apr 2024 · 2 years ago
Holds Austin Vernon
Same subject: batteries
Apple's risk is being reduced to hardware: people keep buying the best phone while everything they do on it comes from someone else's model.
Last stated 2 Sept 2025 · a year ago
Holds Benedict Evans
Same subject: energy
A country outside the AI supply chain should just buy the index — which works only in the world where AI ends up commoditised rather than concentrated.
Last stated 4 Jun 2026 · 4 months ago
Holds Alex Imas
Same subject: energy
A handful of AI agents is not a handful of colleagues, because agents agree with you constantly and colleagues tell you where you are wrong.
Last stated 22 Mar 2026 · 6 months ago
Holds Nicole Forsgren
Same subject: energy
A hybrid-electric airliner ends up heavier and more complex than the aircraft it replaces and delivers no fuel saving at all.
Last stated 2 Apr 2021 · 5 years ago
Holds Bjorn Fehrm
Same subject: data centers
A data centre earns its county far more tax revenue per gallon of water than a golf course does.
Last stated 11 Oct 2025 · 11 months ago
Holds Andy Masley
Same subject: data centers
A data centre should be split into independent power blocks fed directly at 1500 volts DC, rather than run through one central distribution system.
Last stated 18 Apr 2024 · 2 years ago
Holds Austin Vernon
Same subject: data centers
After the cloud exit, the next step is out of the data centre: home servers and multi-gigabit home connections make the garage startup literal again.
Last stated 12 Jul 2025 · a year ago
Holds David Heinemeier Hansson