korrents

korrents · piece

How I've run major projects

Ben Kuhn · 16 Mar 2025

Read the piece on benkuhn.net ↗

3 korrents from this piece ↓

Ben Kuhn did not write this page.

Every claim below was made in this piece, quoted word for word and numbered in the order the piece makes them, so you can read it there rather than take our word for it. The sentence above each quote is our reading of the claim, not their wording. Each quote was checked against a stored copy of the page at build time; where the two differ, the quote is the fact.

  1. One of the most common megaproject failure modes is to not freak out soon enough, and having a concrete plan is the best antidote.
  2. The best project-managers are often not the strongest technical ICs.
  3. "Direction is more important than magnitude"-it's usually better to have a lower-velocity project that works on the right things, than a higher-velocity one that's pointed at the wrong goal.

Keep reading

The other pieces are the ones whose claims are worded most like this one's. That measures language, not agreement: they may argue the opposite.